Installed Capacity | 5,5 MW |
Location | Over Güdül River – Darende / Malatya |
Regulator Type | River Type |
Annual Production | 37,000,000 kWh |
Number of Turbines | 2 |
Unit Installed Power | 2,75 MW |
Commissioning Date | 2012 |
Annual Carbon Emission Reduction Amount | Tons |